{"id":62811,"date":"2026-01-27T15:43:51","date_gmt":"2026-01-27T18:43:51","guid":{"rendered":"https:\/\/staging.portaltela.com\/noticias\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/"},"modified":"2026-01-27T15:43:51","modified_gmt":"2026-01-27T18:43:51","slug":"hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final","status":"publish","type":"post","link":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/","title":{"rendered":"HS2 em Euston volta aos trilhos, ministros dizem, inicia o tunelamento final"},"content":{"rendered":"<p>O governo retomou as obras do HS2 em dire\u00e7\u00e3o a Euston, em Londres, com a ativa\u00e7\u00e3o da primeira das duas tuneladoras de 1.600 toneladas. As m\u00e1quinas come\u00e7am a perfurar os 7,2 quil\u00f4metros de t\u00faneis partindo de Old Oak Common, a sudoeste da capital. A meta \u00e9 concluir o avan\u00e7o at\u00e9 o centro de Londres em 12 a 18 meses.<\/p>\n<p>A supervis\u00e3o \u00e9 do ministro dos Transportes, Lord Hendy, acompanhado pelo secret\u00e1rio-chefe do Tesouro, Darren Jones. Ambos destacaram que o projeto de Euston avan\u00e7a ap\u00f3s anos de reformula\u00e7\u00f5es de desenho e custos. A inaugura\u00e7\u00e3o marca o retorno do HS2 a caminho do centro da cidade.<\/p>\n<p>Os planos atuais preveem uma esta\u00e7\u00e3o reorganizada em Euston, com capacidade para mais de seis plataformas de alta velocidade. A ideia \u00e9 permitir servi\u00e7os adicionais do HS2 al\u00e9m de Birmingham, expandindo conectividades futuras pela rede ferrovi\u00e1ria.<\/p>\n<h3>Progresso e financiamento<\/h3>\n<p>Hendy afirmou que o design espacial est\u00e1 pr\u00f3ximo de ser finalizado entre as partes envolvidas, abrindo espa\u00e7o para maior uso da infraestrutura. Jones reiterou o compromisso do governo em manter o HS2 no caminho certo e apontou que a conclus\u00e3o do t\u00fanel pode estimular grandes oportunidades de desenvolvimento para Londres.<\/p>\n<p>O Minist\u00e9rio dos Transportes mant\u00e9m di\u00e1logos com potenciais desenvolvedores e parceiros para Euston, com uma aposta em investimentos p\u00fablicos e privados focados em habita\u00e7\u00e3o acess\u00edvel e oportunidades de emprego, al\u00e9m de investimento comercial. O objetivo \u00e9 integrar o HS2 \u00e0 rede existente.<\/p>\n<h3>Contexto do cronograma<\/h3>\n<p>O in\u00edcio das obras de t\u00fanel ocorre ap\u00f3s a conclus\u00e3o recente de outros trechos relevantes, incluindo as Chiltern tunnels de 16,1 quil\u00f4metros j\u00e1 finalizadas, o maior desvio de t\u00fanel do projeto. A dire\u00e7\u00e3o enfatiza que o HS2 dever\u00e1 ser implementado no centro de Londres como parte de uma estrat\u00e9gia de crescimento econ\u00f4mico.<\/p>\n<p>Mark Wild, CEO da HS2 Ltd, classificou o come\u00e7o da tunelagem como sinal de confian\u00e7a na constru\u00e7\u00e3o at\u00e9 a \u00e1rea central da capital. Ele trabalha para um novo cronograma de obras e or\u00e7amento, ainda sujeito \u00e0 aprova\u00e7\u00e3o oficial, com previs\u00e3o de conclus\u00e3o e abertura na d\u00e9cada de 2030.<\/p>\n<p>A previs\u00e3o de abertura completa, no entanto, permanece sujeita a ajustes. A administra\u00e7\u00e3o indicou que o cronograma anterior para 2033 n\u00e3o \u00e9 mais vi\u00e1vel, reiterando o objetivo de terminar o projeto nos anos 2030.<\/p>\n","protected":false},"excerpt":{"rendered":"<ul>\n<li>Os ministros afirmam que a esta\u00e7\u00e3o Euston, redesenhada, ser\u00e1 grande o suficiente para atender a demanda nacional, com as obras chegando aos \u00faltimos quil\u00f4metros at\u00e9 o centro de Londres.<\/li>\n<li>A primeira das duas tuneladoras alem\u00e3s de 1.600 toneladas foi ligada no canteiro de Old Oak Common, em Londres, marcando o in\u00edcio das escava\u00e7\u00f5es para os t\u00faneis de 4,5 milhas.<\/li>\n<li>A fase de tunelamento deve durar entre 12 e 18 meses; ainda n\u00e3o foram divulgados o terminus exato nem os detalhes de financiamento.<\/li>\n<li>O ministro das ferrovias, Lord Hendy, e o secret\u00e1rio-chefe Darren Jones indicaram que Euston poder\u00e1 ter mais de seis plataformas e conectar\u00e1 o HS2 a outras partes da Inglaterra.<\/li>\n<li>O governo planeja investimento p\u00fablico e privado durante o desenvolvimento, com foco em habita\u00e7\u00e3o acess\u00edvel e oportunidades de emprego; melhorias em Euston s\u00e3o vistas como parte de um retorno do HS2 ao seu cronograma.<\/li>\n<\/ul>\n","protected":false},"author":15,"featured_media":62812,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"summary":"Tunelamento final do HS2 em Euston come\u00e7a, com a esta\u00e7\u00e3o redesenhada devendo comportar mais plataformas e conectar a rede do norte, impulsionando a economia","footnotes":""},"categories":[1068,798],"tags":[84,94,1106,91,1025,389],"class_list":["post-62811","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ferrovias","category-transporte","tag-acontecimentos-internacionais","tag-economia","tag-engenharias-e-tecnologias","tag-governo","tag-investimentos","tag-transporte"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>HS2 em Euston volta aos trilhos, ministros dizem, inicia o tunelamento final - Portal Tela (STAGING)<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"HS2 em Euston volta aos trilhos, ministros dizem, inicia o tunelamento final\" \/>\n<meta property=\"og:description\" content=\"Os ministros afirmam que a esta\u00e7\u00e3o Euston, redesenhada, ser\u00e1 grande o suficiente para atender a demanda nacional, com as obras chegando aos \u00faltimos quil\u00f4metros at\u00e9 o centro de Londres. A primeira das duas tuneladoras alem\u00e3s de 1.600 toneladas foi ligada no canteiro de Old Oak Common, em Londres, marcando o in\u00edcio das escava\u00e7\u00f5es para os t\u00faneis de 4,5 milhas. A fase de tunelamento deve durar entre 12 e 18 meses; ainda n\u00e3o foram divulgados o terminus exato nem os detalhes de financiamento. O ministro das ferrovias, Lord Hendy, e o secret\u00e1rio-chefe Darren Jones indicaram que Euston poder\u00e1 ter mais de seis plataformas e conectar\u00e1 o HS2 a outras partes da Inglaterra. O governo planeja investimento p\u00fablico e privado durante o desenvolvimento, com foco em habita\u00e7\u00e3o acess\u00edvel e oportunidades de emprego; melhorias em Euston s\u00e3o vistas como parte de um retorno do HS2 ao seu cronograma.\" \/>\n<meta property=\"og:url\" content=\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/\" \/>\n<meta property=\"og:site_name\" content=\"Portal Tela (STAGING)\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-27T18:43:51+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/54.92.202.131\/s.7ew10tin\/2026\/01\/3083.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"796\" \/>\n\t<meta property=\"og:image:height\" content=\"448\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Telinha\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Telinha\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#article\",\"isPartOf\":{\"@id\":\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/\"},\"author\":{\"name\":\"Telinha\",\"@id\":\"http:\/\/54.92.202.131\/#\/schema\/person\/89d764bb518c9e861868915fca9f0e5d\"},\"headline\":\"HS2 em Euston volta aos trilhos, ministros dizem, inicia o tunelamento final\",\"datePublished\":\"2026-01-27T18:43:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/\"},\"wordCount\":418,\"publisher\":{\"@id\":\"http:\/\/54.92.202.131\/#organization\"},\"image\":{\"@id\":\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/54.92.202.131\/s.7ew10tin\/2026\/01\/3083.jpg\",\"keywords\":[\"Acontecimentos internacionais\",\"economia\",\"engenharias e tecnologias\",\"governo\",\"investimentos\",\"Transporte\"],\"articleSection\":[\"Ferrovias\",\"Transporte\"],\"inLanguage\":\"pt-BR\",\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"http:\/\/54.92.202.131\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/\",\"url\":\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/\",\"name\":\"HS2 em Euston volta aos trilhos, ministros dizem, inicia o tunelamento final - Portal Tela (STAGING)\",\"isPartOf\":{\"@id\":\"http:\/\/54.92.202.131\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#primaryimage\"},\"image\":{\"@id\":\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/54.92.202.131\/s.7ew10tin\/2026\/01\/3083.jpg\",\"datePublished\":\"2026-01-27T18:43:51+00:00\",\"breadcrumb\":{\"@id\":\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#primaryimage\",\"url\":\"http:\/\/54.92.202.131\/s.7ew10tin\/2026\/01\/3083.jpg\",\"contentUrl\":\"http:\/\/54.92.202.131\/s.7ew10tin\/2026\/01\/3083.jpg\",\"width\":796,\"height\":448,\"caption\":\"Darren Jones, chief secretary to the prime minister, speaks to the media in London during a ceremony to switch on an HS2 tunnelling machine.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"http:\/\/54.92.202.131\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"HS2 em Euston volta aos trilhos, ministros dizem, inicia o tunelamento final\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\/\/54.92.202.131\/#website\",\"url\":\"http:\/\/54.92.202.131\/\",\"name\":\"Portal Tela (STAGING)\",\"description\":\"As not\u00edcias mais relevantes do momento na sua Tela, para voc\u00ea.\",\"publisher\":{\"@id\":\"http:\/\/54.92.202.131\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\/\/54.92.202.131\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"http:\/\/54.92.202.131\/#organization\",\"name\":\"Portal Tela\",\"alternateName\":\"Tela\",\"url\":\"http:\/\/54.92.202.131\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"http:\/\/54.92.202.131\/#\/schema\/logo\/image\/\",\"url\":\"\",\"contentUrl\":\"\",\"caption\":\"Portal Tela\"},\"image\":{\"@id\":\"http:\/\/54.92.202.131\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"http:\/\/54.92.202.131\/#\/schema\/person\/89d764bb518c9e861868915fca9f0e5d\",\"name\":\"Telinha\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/f4ba3b1e2fe57d2d502b017cfc594704e315e46d7e9d6c2779c4dc57c4d9d143?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f4ba3b1e2fe57d2d502b017cfc594704e315e46d7e9d6c2779c4dc57c4d9d143?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f4ba3b1e2fe57d2d502b017cfc594704e315e46d7e9d6c2779c4dc57c4d9d143?s=96&d=mm&r=g\",\"caption\":\"Telinha\"},\"url\":\"http:\/\/54.92.202.131\/por\/438220146359\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"HS2 em Euston volta aos trilhos, ministros dizem, inicia o tunelamento final - Portal Tela (STAGING)","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"pt_BR","og_type":"article","og_title":"HS2 em Euston volta aos trilhos, ministros dizem, inicia o tunelamento final","og_description":"Os ministros afirmam que a esta\u00e7\u00e3o Euston, redesenhada, ser\u00e1 grande o suficiente para atender a demanda nacional, com as obras chegando aos \u00faltimos quil\u00f4metros at\u00e9 o centro de Londres. A primeira das duas tuneladoras alem\u00e3s de 1.600 toneladas foi ligada no canteiro de Old Oak Common, em Londres, marcando o in\u00edcio das escava\u00e7\u00f5es para os t\u00faneis de 4,5 milhas. A fase de tunelamento deve durar entre 12 e 18 meses; ainda n\u00e3o foram divulgados o terminus exato nem os detalhes de financiamento. O ministro das ferrovias, Lord Hendy, e o secret\u00e1rio-chefe Darren Jones indicaram que Euston poder\u00e1 ter mais de seis plataformas e conectar\u00e1 o HS2 a outras partes da Inglaterra. O governo planeja investimento p\u00fablico e privado durante o desenvolvimento, com foco em habita\u00e7\u00e3o acess\u00edvel e oportunidades de emprego; melhorias em Euston s\u00e3o vistas como parte de um retorno do HS2 ao seu cronograma.","og_url":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/","og_site_name":"Portal Tela (STAGING)","article_published_time":"2026-01-27T18:43:51+00:00","og_image":[{"width":796,"height":448,"url":"http:\/\/54.92.202.131\/s.7ew10tin\/2026\/01\/3083.jpg","type":"image\/jpeg"}],"author":"Telinha","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Telinha","Est. tempo de leitura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#article","isPartOf":{"@id":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/"},"author":{"name":"Telinha","@id":"http:\/\/54.92.202.131\/#\/schema\/person\/89d764bb518c9e861868915fca9f0e5d"},"headline":"HS2 em Euston volta aos trilhos, ministros dizem, inicia o tunelamento final","datePublished":"2026-01-27T18:43:51+00:00","mainEntityOfPage":{"@id":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/"},"wordCount":418,"publisher":{"@id":"http:\/\/54.92.202.131\/#organization"},"image":{"@id":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#primaryimage"},"thumbnailUrl":"http:\/\/54.92.202.131\/s.7ew10tin\/2026\/01\/3083.jpg","keywords":["Acontecimentos internacionais","economia","engenharias e tecnologias","governo","investimentos","Transporte"],"articleSection":["Ferrovias","Transporte"],"inLanguage":"pt-BR","copyrightYear":"2026","copyrightHolder":{"@id":"http:\/\/54.92.202.131\/#organization"}},{"@type":"WebPage","@id":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/","url":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/","name":"HS2 em Euston volta aos trilhos, ministros dizem, inicia o tunelamento final - Portal Tela (STAGING)","isPartOf":{"@id":"http:\/\/54.92.202.131\/#website"},"primaryImageOfPage":{"@id":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#primaryimage"},"image":{"@id":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#primaryimage"},"thumbnailUrl":"http:\/\/54.92.202.131\/s.7ew10tin\/2026\/01\/3083.jpg","datePublished":"2026-01-27T18:43:51+00:00","breadcrumb":{"@id":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/"]}]},{"@type":"ImageObject","inLanguage":"pt-BR","@id":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#primaryimage","url":"http:\/\/54.92.202.131\/s.7ew10tin\/2026\/01\/3083.jpg","contentUrl":"http:\/\/54.92.202.131\/s.7ew10tin\/2026\/01\/3083.jpg","width":796,"height":448,"caption":"Darren Jones, chief secretary to the prime minister, speaks to the media in London during a ceremony to switch on an HS2 tunnelling machine."},{"@type":"BreadcrumbList","@id":"http:\/\/54.92.202.131\/transporte\/2026\/01\/27\/hs2-em-euston-volta-aos-trilhos-ministros-dizem-inicia-o-tunelamento-final\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"http:\/\/54.92.202.131\/"},{"@type":"ListItem","position":2,"name":"HS2 em Euston volta aos trilhos, ministros dizem, inicia o tunelamento final"}]},{"@type":"WebSite","@id":"http:\/\/54.92.202.131\/#website","url":"http:\/\/54.92.202.131\/","name":"Portal Tela (STAGING)","description":"As not\u00edcias mais relevantes do momento na sua Tela, para voc\u00ea.","publisher":{"@id":"http:\/\/54.92.202.131\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/54.92.202.131\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"http:\/\/54.92.202.131\/#organization","name":"Portal Tela","alternateName":"Tela","url":"http:\/\/54.92.202.131\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"http:\/\/54.92.202.131\/#\/schema\/logo\/image\/","url":"","contentUrl":"","caption":"Portal Tela"},"image":{"@id":"http:\/\/54.92.202.131\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"http:\/\/54.92.202.131\/#\/schema\/person\/89d764bb518c9e861868915fca9f0e5d","name":"Telinha","image":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/secure.gravatar.com\/avatar\/f4ba3b1e2fe57d2d502b017cfc594704e315e46d7e9d6c2779c4dc57c4d9d143?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f4ba3b1e2fe57d2d502b017cfc594704e315e46d7e9d6c2779c4dc57c4d9d143?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f4ba3b1e2fe57d2d502b017cfc594704e315e46d7e9d6c2779c4dc57c4d9d143?s=96&d=mm&r=g","caption":"Telinha"},"url":"http:\/\/54.92.202.131\/por\/438220146359\/"}]}},"_links":{"self":[{"href":"http:\/\/54.92.202.131\/api\/wp\/v2\/posts\/62811","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/54.92.202.131\/api\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/54.92.202.131\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/54.92.202.131\/api\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"http:\/\/54.92.202.131\/api\/wp\/v2\/comments?post=62811"}],"version-history":[{"count":0,"href":"http:\/\/54.92.202.131\/api\/wp\/v2\/posts\/62811\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/54.92.202.131\/api\/wp\/v2\/media\/62812"}],"wp:attachment":[{"href":"http:\/\/54.92.202.131\/api\/wp\/v2\/media?parent=62811"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/54.92.202.131\/api\/wp\/v2\/categories?post=62811"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/54.92.202.131\/api\/wp\/v2\/tags?post=62811"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}